Connect with us

Hi, what are you looking for?

Mario Cuomo Bridge

Bikers, Beware: TZB Bridge Work Ahead

New TZB Under Construction. Photo Credit: Ray WrightSouth Nyack, Sept 9 — Cars and cyclists should use extra caution while riding on River Road in South Nyack from now through November. That’s because crews working on the new Tappan Zee Bridge are beginning utility work that will reduce sections of Piermont Ave/River Road to one lane during daytime hours. After hours there’s still reason to take it slow: temporary steel coverings on the roadway will create uneven driving surfaces that might mean flats for cars and more serious bumps for bicyclists.

Here’s the short list of ongoing operations at the Tappan Zee Bridge site:

  • Dredging operations will continue 24/7
  • Test pile program
  • Rockland bulkhead construction and Dock Extension at Rockland under existing bridge
  • Temporary Rockland trestle construction including pile driving on weekdays from 7 a.m. to 7 p.m.
  • Temporary Westchester trestle construction including pile driving on weekdays from 7 a.m. to 7 p.m.
  • Survey inspections on existing bridge
  • Mobilization at the exit 10 staging area
  • Support for river-based work from the Rockland shoreline

Source:  NewNYBridge.com

Photo Credit: Ray Wright


Nyack People & Places, a weekly series that features photos and profiles of citizens and scenes near Nyack, NY, is sponsored by Ellis Sotheby’s International Realty.


You May Also Like

Arts

Our roundup of events this week includes an African American Day parade and festival, a memorial toy drive, tea time at the new Savanna...

Arts

Our roundup of events this week includes a free movie screening, the premier of Castling at Penguin Rep Theatre, art in the park, vintage...

Arts

Our roundup of events this week includes free BridgeMusik concerts, Jazz in the Garden, the premier of Castling at Penguin Rep Theatre, Pharrell Williams’...